The challenge
Delivering 10 MW of charging capacity on a live airport landside, with rigorous safety, security and aesthetic requirements.
Airport authority · Málaga, Spain · 2026
A medium-voltage connection, two transformer stations and 40 high-power stalls delivered as a piece of civic architecture.

Delivering 10 MW of charging capacity on a live airport landside, with rigorous safety, security and aesthetic requirements.
Two 5 MVA transformer stations, ring-main MV distribution, 40 stalls under a lit canopy with integrated PV, full OCPP back-end and roaming.
Nineteen months including civils, executed in security-controlled phases with night works only.
“It looks like part of the terminal, not like equipment parked next to it. That mattered enormously.”
Monthly kWh, first full operating year.