Installation done to engineering standards
We calculate available capacity at the supply point, size the cable for the real route length and grouping factors, install a dedicated type A + 6 mA DC or type B RCD as required, and commission with a full test certificate.
- Load assessment against main fuse rating
- Dynamic load management to avoid supply upgrades
- Dedicated circuit protection and earthing verification
- Certification and handover documentation
